Client name: Iluka Resources
Location: Eneabba, Western Australia
Duration: October 2020 – December 2021
Services provided:
- Detailed Design
- Review of Process Design Criteria
- Civil, Concrete and SMP installation, including all pricing schedules
- Preparation of equipment scopes of supply
- Scope of works of vendor packages
- Provision of technical support during construction
- Completion of HAZOP workshop and associated HAZOP report
- 3D site model
Eneabba Mineral Sands Recovery Project: Phase 2 Detailed Design
Iluka Resources contracted Tetra Tech Proteus to conduct the Detailed Design of phase 2 of the Eneabba Mineral Sands Recovery Project (EMSRP). The process includes conditioning, flotation, filtration and dewatering to produce two products: a high-grade 90% Monazite concentrate and a gravity concentrate consisting predominantly of Zircon and Ilmenite.
Tetra Tech Proteus delivered plans for a full engineering drawing, complete with supporting technical specifications and data sheets for all required packages. Details regarding nomination of all supply, fabrication, construction, installation and commissioning required by the client were also delivered by Tetra Tech Proteus. All works were commensurate with requirements of the project, current applicable legislation and industry best practice for a safe working environment, and also drafted with the intent to minimise disruption to existing operations.